Search
 

Levee Repairs along the Columbia River on Marine Drive

WHO WE ARE / PROJECTS

MCDD

Levee Repairs along the Columbia River on Marine Drive

Date

April 19, 2019

Project Manager:

Sunny Simpkins

Project Summary:

In Spring 2017, there were two periods of high water along the Columbia River that caused erosion of portions of the levee system near NE 122nd and Marine Drive. To protect the levee against additional erosion, MCDD contracted an excavator to reinforce the levee system in this area.

Benefit:

Protect MCDD levee from additional erosion, which could undermine the function of the levee system.

Like
No Comments

Sorry, the comment form is closed at this time.