SDIC
April 19, 2019
Josh McNamee
During the winter of 2018, one of the pumps at the Sandy Pump Station became unusable, requireing a replacement. Later that summer, a replacement pump was manufactured and installed in the Sandy Pump Station. Everything was back up and running for the fall 2018 flood season.
Protected landowners from the risk of flooding by providing pump redundancy for larger storms.
No Comments
Sorry, the comment form is closed at this time.